Moss Abbruch Pilzhochstrasse demolition, Ludwigshafen
22 July 2021
The German contractor Moss Abbruch takes down a bridge in the city of Ludwigshafen in Rhineland-Palatinate in the south west of the country.
The bridge was 540 m (1,771 ft) long and had a solid mass of around 11,000 cubic metres (388,000 cu ft).
To read more about Moss Abbruch and other leading global demolition contractors, check out the d&ri100 listing in the July-August issue of Demolition & Recycling International.
CONNECT WITH THE TEAM
Leila Steed
Editor, Demolition & Recycling International
Tel: +44(0) 1892 786 261
E-mail: [email protected]